• Skip to primary navigation
  • Skip to main content

A blog from my dog

Rufus the Cocker Spaniel explores the big world

  • Home
    • About Us
    • Privacy
    • Cookie policy (UK)
    • Contents
    • How we built this website
  • Featured
    • Expeditions
    • Gadgets and boys toys
    • General
    • Spreading the Word
    • Weather
  • Contact Us
    • Your feedback
  • Gallery
    • Photo galleries
  • Online Store
  • Terms & conditions
  • Show Search
Hide Search
Workington Rail production ceased in 2006

Steel rails made in Workington

Thanks to the low morning sunshine I made a new discovery on my walk west to Dalston yesterday.

A steel rail with the date 1977 stamped onto it
A steel rail with the date 1977 stamped onto it — Click image for larger view

At one point the path comes quite close to the railway tracks and, thanks to the position of the sun casting shadows, I could see some writing on the surface of the steel rails (Click image for larger view).

BS 113A – O -BSC Workington – 1977 -BR

The raised rusty brown lettering, hidden from sight beneath the top curve of the rail, made me wonder more about the history of this piece of steel and if the date 1977 referred to its date of manufacture.

Train travelling towards Dalston, Cumbria
Train travelling towards Dalston, Cumbria

Workington steel rails

It turns out that steel made in Workington, on the west coast of Cumbria, was of a very high quality and was transported all over the world.

It is reported that the worlds first large scale steelworks was in the Moss Bay area of the town. It operated under the title of The Moss Bay Hematite Iron Company.

The works once housed a number of Bessemer Converters, established by the father of steel mass production, Henry Bessemer.

When the steel production plant closed in 1974 the No.1 Converter was taken to Kelham Island Museum in Sheffield, where it remains. It is one of only three remaining examples in the world.

Workington Rail production ceased in 2006
Workington Rail production ceased in 2006

The Company rolled the first steel rails on 13th August, 1877.  The rail processing and production plant closed in August 2006.

Thousands of trains

Looking back at the rail I spotted and after a little bit of a mental calculation given the 37 years it may have been in service I estimate that:

If I assume 4 trains per day average,  my calculations reveal around 52,000 trains have passed along this line so far.

To me that is amazing, but do you know the actual total ? Maybe you can add to the history of the Workington steel works or the track near Dalston?  Let me know in the comments area below.

Until next time

Licks and wags

Charlie

Written by:
admin
Published on:
June 28, 2014

Categories: Featured, GeneralTags: Cumbria, Dalston, rail, Trains, Workington

Footer

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Copyright © 2026 ·Navigation Pro · Genesis Framework by StudioPress · WordPress · Log in

Manage Cookie Consent
We use cookies to optimise our website and our service.
Functional cookies Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}